A708 Moffat to Selkirk

2013-14 Works by DGFirst

Strategic Roads Programme (£391,000 – 6 locations)
A708 Hunterheck/Hillend Cottage
A708 Craigieburn Bridge
A708 Shortwoodend to Roundstonefoot
A708 Blackshope to Carrifran
A708 Carrifran to Polmoody
A708 Swine Cleuchs

The work to be undertaken at the 6 locations have still to be assessed and verified.

Strategic Roads Programme A&E (£50,000)
A708 Drainage works

Structures Programme (approx £60,000)
A708 Polmoody Culvert

Works carried out in 2012-13
A708 Polmoody Culvert (design only 2012-13 at a cost of approx £5,000)

A708 Craigieburn – North East of Moffat FC Car Park
The Timber Transport Officer also advises that at the beginning of 2012-13 the Forestry Commission cut back overhanging trees from the A708 to let the surface of the road dry out at no cost to Dumfries and Galloway Council.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s